Demand-Diversity Factor Value Quick Reference

 

Diversity Factor (NBC)

Type of Load

Type of Building

Individual House Hold , Individual Dwelling of a BlockSmall Shops, Stores, Offices & Business PremisesSmall Hotels, Boarding Houses, etc
Lighting66% of  total current demand90% of total current demand75% of total current demand
Heating and power100% of total current demand up to 10 A+ 50 % of any current  demand in excess of 10 A100% of full load of largest Appliance + 75% of Remaining appliances100% of full load of largest appliance+ 80% of second largest appliance + 60% of remaining appliances
Cooking appliances10 A +30 percent full load of
connected cooking appliances in excess of 10 A + 6 A if socket-outlet incorporated in the unit
100 % of full load of largest appliance + 80% of full load of second largest appliance + 60% of full load of Remaining appliances100 % of full load of largest appliance + 80 % of full load of second largest appliance + 60% of full load of Remaining appliances
Motors (other than lift motors which are subject to special consideration)100% of full load of largest Motor + 80% of full load of second largest motor100 % of full load of largest Motor + 50%of full load of remaining motors
Water heater (instantaneous)100 % of full load of largest Appliance + 100%of full load of second largest appliance + 25 %of full load of remaining appliances100 % of full load of largest Appliance + 100%of full load of second largest appliance + 25 %of full load of remaining appliances100 % of full load of largest Appliance + 100%of full load of second largest appliance + 25 %of full load of remaining appliances
Water heater (thermostatically controlled)No diversity
Standard arrangements of final circuits in accordance with good practice100 percent of the current demand of the largest circuit + 40 percent of the current demand of every other circuit100 percent of the current
demand of the largest circuit + 50 percent of the current demand of every other circuit
Socket outlets other than above and stationary equipment other than those listed above100% of the current demand of the largest point + 40%of the current demand of every other point100% of the current
demand of the largest point+ 75 % of the current demand of every other point
100%of the current demand of the largest point
+ 75%of the current demand of every point in main rooms (dining rooms, etc) + 40 % of the current demand of every other point
After calculating the electrical load on the above basis, an overall load factor of 70 to 90 percent is to be applied to arrive at the minimum capacity of substation.

 

Demand Factors (As Per Table 220.42  NEC)

Type of OccupancyElectrical LoadDemand Factor
Dwelling unitsFirst 3000 VA100%
From 3001 to 120,000 VA35%
Remainder over 120,000V A25%
HospitalsFirst 50,000 VA or less40%
Remainder over 50,000 VA20%
Hotels and motels, including apartment houses without provision for cooking by tenantsFirst 20,000 VA50%
20,001 VA to 100,000 VA40%
Remainder over 100,000 VA30%
Warehouses storageFirst 12,500 VA100%
Remainder over 12,500 VA50%
All othersTotal volt-ampere100%

 

Non-dwelling Lighting Loads Demand Factors (As Per 220.44  NEC)

Type of OccupancyElectrical LoadDemand Factor
Non-dwelling Receptacle LoadsFirst 10KVA100%
Remainder over 10KVA50%

 

Diversity (The Electricians Guide 5th Edition by John Whitfield)

Type of final circuitType of premises
HouseholdsSmall shops, stores, officesHotels, guest houses
Lighting66% total demand90% total demand75% total demand
Heating and power100% up to 10 A + 50% balance100%X + 75%(Y+Z)100%X + 80%Y + 60%Z
Cookers10 A + 30% balance + 5 A for socket100%X + 80%Y + 60%Z100%X + 80%Y + 60%Z
Motors (but not lifts)100%X + 80%Y + 60%Z100%X + 50%(Y+Z)
Instantaneous water heaters100%X + 100%Y + 25%Z100%X + 100%Y + 25%Z100%X + 100%Y + 25%Z
Thermostatic water heaters100%100%100%
Floor warming installations100%100%100%
Thermal storage heating100%100%100%
Standard circuits100%X + 40%(Y+Z)100%X + 50%(Y+Z)100%X + 50%(Y+Z)
Sockets and stationary equip.100%X + 40%(Y+Z)100%X + 75%(Y+Z)100%X + 75%Y + 40%Z
X = the full load current of the largest appliance or circuit
Y = the full load current of the second largest appliance or circuit
Z = the full load current of the remaining appliances or circuits

 

Diversity factor for Building (Horizon Power)

No of customerDiversity factor
13
22.57
32.2
42
51.89
61.8
71.74
81.71
91.69
101.64
111.61
12 To 141.57
15 To 171.5
18 To 201.46
21 To 231.42
24 to 261.4
27 To 291.38
30 To 591.37
≥601

 

Demand Factor (The Electricians Guide Fifth Edition) by John Whitfield)

AreaDemand Factor
Office / School40%
Technical Blocks / Hospital50%
Air Port / Banks / Department Store / Shopping Center / Public Place60%
Restaurants / Factories (for 8 Hours Shifts)70%
Workshops / Factories (for 24 Hours Shifts)80%
Arc Furnace90 % TO 100%
Arc Welding20 % TO 50%
Compressor20 % TO 50%
Conveyor Crane90 % TO 100%
Had tool20 % TO 40%
Paper Mills50 % TO 70%
Induction Furnace80 % TO 100%

 

Demand Factor As per No of Appliances

No of Appliances(A) Less than 3.5 KW(B) 3.5 KW to 8.5 KW(C) Less 12 KW
180%80%8%
275%65511%
370%55%14%
466%50%17%
562%45%20%
659%43%21%
756%36%22%
853%35%23%
951%34%24%
1049%32%25%
1147%32%26%
1245%32%27%
1343%32%28%
1441%32%29%
1540%32%30%
1639%28%31%
1738%28%32%
1837%28%33%
1936%28%34%
2035%28%35%
2134%26%36%
2233%26%37%
2332526%38%
2431%26%39%
2530%26%40%
26 To 3030%24%15KW+1KW for Each
31 To 4030%22%
41 To 5030%20%25KW+0.75KW for Each

 

51 To 6030%18%
More Than 6030%16%

 

Lighting Demand for Building (As per NBC)

Lighting demand for buildings should be considered as per type of building.
Where nothing is specified, for lighting demand of any type of building a maximum of 13 W/m2 of all built-up areas including balconies.
Covered parking areas may be considered at 3.23 W/m2 including balconies, service areas, corridors, etc, may be considered with very basic diversity of 80 % to 100 %.
Power requirements shall be considered at least 55 W/m2 with an overall diversity not exceeding 50 %. These shall be excluding defined loads such as  lifts,  plumbing  system,  fire  fighting  systems, ventilation requirement, etc.